MODIS MOD/MYD13A2 C6.1 DOY 89 incomplete
Posted: Fri Apr 21, 2023 5:47 am America/New_York
For about 4 days now, 20 tiles in my selection of 46 have been produced for DOY 89: https://e4ftl01.cr.usgs.gov/MOLA/MYD13A2.061/2023.03.30/
However, since then the production has come to a halt. Meaning that the 26 more tiles that I need are not coming in: h18v05, h19v05, h20v09, h21v09, h15v07, h17v05, h22v09, h19v06, h19v11, h21v05, h17v06, h23v11, h20v11, h23v10, h19v09, h16v07, h20v06, h20v12, h23v08, h18v08, h23v07, h20v05, h22v07, h17v07, h18v07, h21v08
When I can I expect the data to arrive?
However, since then the production has come to a halt. Meaning that the 26 more tiles that I need are not coming in: h18v05, h19v05, h20v09, h21v09, h15v07, h17v05, h22v09, h19v06, h19v11, h21v05, h17v06, h23v11, h20v11, h23v10, h19v09, h16v07, h20v06, h20v12, h23v08, h18v08, h23v07, h20v05, h22v07, h17v07, h18v07, h21v08
When I can I expect the data to arrive?